侯波 1   叶锋 2   熊志全 2   谭闵 2   魏杰 2   席海霞 3   龚伟志 3  
文摘 介绍了普吉变电站的超导电缆系统的技术参数、结构和并网运行的基本情况,与美国、丹麦的同等项目做了技术指标的比较,并用Monoblock model、Bean model等方法对超导电缆的损耗进行了计算,电缆及系统各部分损耗的计算结果与实际运行数据相符,随着电缆长度的增加,超导电缆系统的节能效果将越来越明显,普吉超导电缆系统能够在自然条件及电网各种工况下完成电能的输送。
其他语种文摘 The structure, technical parameters of high temperature superconductor (HTS) power cable system of Puji substation, that locates in Yunnan province, China and put into operation since April, 2004, as well as its on-line operation condition are presented and the technical indices of this project are compared with these of coordinative items in United States and Denmark. The losses of superconductor power cable system are calculated by the methods such as Monoblock model and Bean model, the calculation results of losses in cables themselves and in other parts of superconductor power cable system coincide with the data from practical operation. Along with the increment of cable length the energy saving effect of superconductor power cable system become more and more evident. The high temperature superconductor (HTS) power cable system configured in Puji substation can transmit electrical energy under natural conditions and various operation conditions of power network.
来源 电网技术 ,2006,30(14):24-29 【核心库】
关键词 高温超导 ; 电力电缆 ; 并网运行 ; 损耗 ; 输配电工程
地址

1. 中国科学院等离子体物理研究所, 安徽, 合肥, 230031  

2. 云南电网公司, 云南, 昆明, 650011  

3. 云电英纳超导电缆有限公司, 北京, 100176

语种 中文
文献类型 研究性论文
ISSN 1000-3673
学科 电工技术
文献收藏号 CSCD:2544950

参考文献 共 19 共1页

1.  Hou Bo. Power application of high temperature superconductivity. World Engineers'Convention,2004:238-243 CSCD被引 1    
2.  Grant P M. Why mgb2 work?. American Institute of Physics,2001,10(11):22-23 CSCD被引 1    
3.  信赢. 21世纪电力传输新材料-高温超导电缆综述与展望. 电线电缆,2004(1):3-9 CSCD被引 6    
4.  张勇刚. 高温超导电缆监测与保护系统管理软件的开发. 电网技术,2005,29(1):1-5 CSCD被引 1    
5.  杨军. 高温超导电缆在电力系统中的应用. 电网技术,2004,28(21):21-24 CSCD被引 1    
6.  徐德鸿. 超导储能装置用GTO PWM电流型变流器模块方阵. 中国电机工程学报,1998,18(2):124-130 CSCD被引 15    
7.  方进. 运行温度对NbTi管内电缆导体瞬态稳定性的影响实验研究与分析. 中国电机工程学报,2003,23(4):113-118 CSCD被引 8    
8.  王付胜. 饱和铁心型高温超导故障限流器数学模型的分析与参数设计. 中国电机工程学报,2003,23(8):135-139 CSCD被引 34    
9.  杨军. 我国首套高温超导电缆并网运行情况. 电网技术,2005,29(4):1-4 CSCD被引 1    
10.  Kelley N J. etal. IEEE Trans on Applied Superconductivity,2001,11(1):2461-2466 CSCD被引 1    
11.  Nassi M. Qualification results of a 50 m 115 kV warm dielectric cable system. IEEE Trans on Applied Superconductivity,2001,11(1):2355-2358 CSCD被引 1    
12.  毕延芳. 35 kV/2 kA高温超导电力电缆终端. 低温物理学报,2003,25(增刊):525-529 CSCD被引 3    
13.  Xin Ying. China's 30m 35 kV/2 kA AC HTS power cable project. Superconductivity Science Technology,2004(17):332-335 CSCD被引 1    
14.  Demko J A. Practical AC loss and thermal considerations for HTS power transmission cable systems. IEEE Trans onApplied Superconductivity,2001,11(1):1789-1792 CSCD被引 8    
15.  Vellege G. An analysis of the transport losses measured on HTSC single-phase conductor prototype. Superconductivity Science Technology,1995(8):476-483 CSCD被引 2    
16.  丁怀况. 4M一2000A高温超导电缆制冷系统. 低温与超导,2003,31(3):70-74 CSCD被引 4    
17.  Xi H X. LN2 cooling system for a 3-phase 35kV/2 kA HTS cable. Cryogenic Engineering Conference and International Cryogenic Materials Conference,2004 CSCD被引 1    
18.  施锦. 高温超导电缆液氮流道试验装置的设计计算. 低温与超导,2003,31(4):1-3 CSCD被引 2    
19.  Hou Bo. The development of 4m HTS power cable. Superconductivity Science Technology,2004(17):415-417 CSCD被引 1    
引证文献 2

1 任安林 普吉变电站超导电力设备运行分析 电工技术学报,2012,27(10):86-90
CSCD被引 3

2 马爱清 首条国产公里级高温超导电缆输电特性分析 电网技术,2022,46(3):1206-1213
CSCD被引 3

显示所有2篇文献

论文科学数据集
PlumX Metrics
相关文献

 作者相关
 关键词相关
 参考文献相关

版权所有 ©2008 中国科学院文献情报中心 制作维护:中国科学院文献情报中心
地址:北京中关村北四环西路33号 邮政编码:100190 联系电话:(010)82627496 E-mail:cscd@mail.las.ac.cn 京ICP备05002861号-4 | 京公网安备11010802043238号