半导体封装测试生产线排产研究
Research on Scheduling in Semiconductor Assembly and Test Manufacturing
查看参考文献24篇
文摘
|
以某半导体封装测试(Semiconductor assembly and test manufacturing, ATM)企业为研究背景,对半导体封装测试的生产过程进行分析总结,提出一种新的\产能限定混线车间"(Capacity-limit flexible flow-shop, CLFFS)模型作为半导体封装测试生产线的排产模型.通过对半导体封装测试的特殊逻辑处理、排产方法以及排产规则等进行研究,提出采用逻辑约束和调度规则双层优化控制的启发式正序排产算法作为半导体封装测试的总体排产方法,同时针对批准备单处理生产阶段,提出一种新的预测开机控制优化调度方法.最后,结合CLFFS排产模型和所提出的策略方法,给出半导体封装测试排产的应用研究示例与比较,结果证明本文给定的总体排产方法在ATM中具有很好的可行性和业务逻辑嵌入的即便性,同时本文所提出的新的预测开机控制优化调度方法能够很好的缩短生产周期,提高生产效率. |
其他语种文摘
|
Taking one semiconductor assembly and test manufacturing (ATM) enterprise as the study object, this paper analyzes and summarizes the production process of ATM, and proposes a new model which is named capacity-limit flexible flow-shop (CLFFS) as the scheduling model of ATM. By researching on the special scheduling logic constraints, strategies, and rules of scheduling in ATM, we propose a forward heuristics algorithm which is controlled by both logic constraints and scheduling rules as the general method, and present a novel predictive control scheduling algorithm in batch-prepared one-processed stage. Finally, using the proposed model and method, an application example of scheduling in ATM and comparison are given. The results show that the general method has the effectiveness in practical application and can conveniently embed logic constraints, and that the novel predictive control scheduling algorithm can shorten production cycle and improve enterprise production benefit. |
来源
|
自动化学报
,2014,40(5):892-900 【核心库】
|
DOI
|
10.3724/sp.j.1004.2014.00892
|
关键词
|
半导体封装测试
;
产能限定混线车间
;
启发式算法
;
正序排产
|
地址
|
中国科学院沈阳自动化研究所, 沈阳, 110016
|
语种
|
中文 |
文献类型
|
研究性论文 |
ISSN
|
0254-4156 |
学科
|
自动化技术、计算机技术 |
基金
|
国家重大专项
|
文献收藏号
|
CSCD:5145712
|
参考文献 共
24
共2页
|
1.
.
The enterprises in China: Semiconductor assembly and test manufacturing is promising in China [Online],2012
|
被引
1
次
|
|
|
|
2.
Liao D Y. Daily scheduling for R&D semiconductor fabrication.
IEEE Transactions on Semiconductor Manufacturing,1996,9(4):550-561
|
被引
3
次
|
|
|
|
3.
Xuan H Y. Dynamic hybrid flowshop scheduling with batching production.
Applied Mechanics and Materials,2011,65:562-567
|
被引
1
次
|
|
|
|
4.
吴启迪.
半导体制造系统调度,2006:6-7
|
被引
1
次
|
|
|
|
5.
Garcia-Sabater J P. A twostage sequential planning scheme for integrated operations planning and scheduling system using MILP: the case of an engine assembler.
Flexible Services and Manufacturing Journal,2012,24(2):171-209
|
被引
1
次
|
|
|
|
6.
Xiao J. A MILP-based batch scheduling for two-stage hybrid flowshop with sequence-dependent setups in semiconductor assembly and test manufacturing.
Proceedings of the 2010 Automation Science and Engineering,2010:87-92
|
被引
1
次
|
|
|
|
7.
Pesch E. Late work minimization in flow shops by a genetic algorithm.
Computers and Industrial Engineering,2009,57(4):1202-1209
|
被引
3
次
|
|
|
|
8.
Li Yanjun. A Nested Hybrid Ant colony Algorithm for Hybrid Production Scheduling Problems.
Acta Automatica Sinica,2003,29(1):95-101
|
被引
3
次
|
|
|
|
9.
Song Y. Bottleneck station scheduling in semiconductor assembly and test manufacturing using ant colony optimization.
IEEE Transactions on Automation Science and Engineering,2007,4(4):569-578
|
被引
5
次
|
|
|
|
10.
Jiang Yiwei. An improved algorithm for a hybrid flow-shop problem in graphics processing.
Acta Automatica Sinica,2011,37(11):1381-1386
|
被引
1
次
|
|
|
|
11.
Lu S H. Distributed scheduling based on due dates and buffer priorities.
IEEE Transactions on Automatic Control,1991,36(12):1406-1416
|
被引
12
次
|
|
|
|
12.
Huang Xiaoling. Application of planning and scheduling cascade model of complex system processing to mineral processing MES system.
Acta Automatica Sinica,2011,37(9):1130-1139
|
被引
1
次
|
|
|
|
13.
屈国强. 瓶颈指向的启发式算法求解混合流水车间调度问题.
信息与控制,2012,41(4):514-521,528
|
被引
8
次
|
|
|
|
14.
Lu S H. E±cient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants.
IEEE Transactions on Semiconductor Manufacturing,1994,7(3):374-385
|
被引
1
次
|
|
|
|
15.
Uzsoy R. A review of production planning and scheduling models in the semiconductor industry Part II: shop-floor control.
Institute of Industry Engineers Transactions,1994,26(5):44-55
|
被引
2
次
|
|
|
|
16.
Tovia F. A scheduling heuristic for maximizing wirebonder throughput.
IEEE Transactions on Electronics Packaging Manufacturing,2004,27(2):145-150
|
被引
1
次
|
|
|
|
17.
Chua T J. A heuristic approach for scheduling multi-chip packages for semiconductor backend assembly.
Proceedings of the 2007 IEEE Conference on Emerging Technologies and Factory Automation,2007:1024-1030
|
被引
1
次
|
|
|
|
18.
Yin X F. A rule-based heuristic finite capacity scheduling system for semiconductor backend assembly.
International Journal of Computer Integrated Manufacturing,2004,17(8):733-749
|
被引
1
次
|
|
|
|
19.
Chua T J. A heuristicsbased advanced planning and scheduling system with bottleneck scheduling algorithm.
Proceedings of the 2006 IEEE Conference on Emerging Technologies and Factory Automation,2006:240-247
|
被引
1
次
|
|
|
|
20.
Liao C J. An approach using particle swarm optimization and bottleneck heuristic to solve hybrid flow shop scheduling problem.
Applied Soft Computing,2012,12(6):1755-1764
|
被引
14
次
|
|
|
|
|