新建盾构隧道下穿会对既有隧道周围土体产生扰动,导致既有隧道产生较大的沉降变形.针对该工况,基于两阶段分析法,提出一种理论解析方法,以预测新建盾构隧道下穿引起的既有隧道的沉降变形.利用简化的随机介质理论,求解新建隧道开挖引起的土体自由沉降,并将该沉降施加于既有隧道之上.将既有隧道简化为Timoshenko梁模型,利用Vlazov地基模型模拟隧道-土的相互作用,构建盾构下穿作用下既有隧道的沉降变形微分方程.利用有限差分法对沉降变形微分方程进行求解,得到既有隧道在盾构下穿作用下产生的沉降变形解答.结合两个工程案例,将理论解析结果与实测数据进行对比,验证了所提出的理论解析方法的合理性.对影响既有隧道沉降变形的三个关键参数进行分析,结果表明:既有隧道最大沉降与地层损失率之间呈线性关系,地层损失率越大沉降也越大;随着隧道夹角的减小,既有隧道的变形范围显著增大;增大新旧隧道轴线距离,能够显著减小隧道沉降. |
其他语种文摘
|
New shield tunnel down-crossing inevitably disturbs the surrounding soil and leads to significant settlement deformation of the existing tunnels. Based on the two-stage method, this paper proposed a new analytical method to predict the settlement deformation of existing tunnels due to down-crossing construction of new shield tunnel. The tunneling-induced soil settlement was predicted by the simplified stochastic medium theory, and was then imposed on the existing tunnel. The existing tunnel is simplified as a Timoshenko beam model, and the Vlazov foundation model was adopted to consider the interaction between the tunnel and the soil. The differential equation of settlement deformation of the existing tunnel was established, and solved by the finite difference method. The solution of settlement deformation of the existing tunnel under the new tunnel downcrossing was obtained. The proposed analytical method was validated through comparison with the field measurement data from two case studies. A parametric analysis was conducted to study the influences of three key parameters on the existing tunnel deformation. The results indicate that the maximum settlement of the existing tunnel increases approximately linearly with the volume loss. As the skew angle between tunnels decreases, the deformation range of existing tunnels significantly increases. Increasing the distance between the axes of the new and old tunnels can significantly reduce the tunnel settlement. |
来源
|
力学季刊
,2024,45(3):855-866 【扩展库】
|
DOI
|
10.15959/j.cnki.0254-0053.2024.03.023
|
关键词
|
盾构隧道
;
沉降变形
;
简化随机介质理论
;
Timoshenko梁隧道模型
;
隧道开挖
|
地址
|
1.
中铁十四局集团有限公司, 山东, 济南, 250101
2.
中国地质大学(武汉)工程学院, 湖北, 武汉, 430074
|
语种
|
中文 |
文献类型
|
研究性论文 |
ISSN
|
0254-0053 |
学科
|
公路运输 |
基金
|
中铁十四局集团有限公司科技研发计划项目
;
国家重点研发计划
|
文献收藏号
|
CSCD:7812797
|
参考文献 共
28
共2页
|
1.
庄新玉. 盾构下穿施工既有管线沉降分析及预测.
力学季刊,2024,45(1):239-247
|
CSCD被引
2
次
|
|
|
|
2.
王华宁. 隧道工程解析方法及解析模型研究进展.
力学季刊,2023,44(2):227-257
|
CSCD被引
2
次
|
|
|
|
3.
Loganathan N. Analytical prediction for tunneling-induced ground movements in clays.
Journal of Geotechnical and Geoenvironmental Engineering,1998,124(9):846
|
CSCD被引
292
次
|
|
|
|
4.
Lee K. Subsidence owing to tunnelling. I. Estimating the gap parameter.
Canadian Geotechnical Journal,1992,29:929-940
|
CSCD被引
1
次
|
|
|
|
5.
叶飞. 盾构隧道壁后注浆试验与浆液扩散机理研究进展.
中国公路学报,2020,33(12):92-104
|
CSCD被引
14
次
|
|
|
|
6.
Zhang D M. Analytical solution for the response of an existing tunnel to a new tunnel excavation underneath.
Computers and Geotechnics,2019,108(4):197-211
|
CSCD被引
29
次
|
|
|
|
7.
冯国辉. 新建隧道下穿既有隧道引起的隧-土相互作用研究.
工程力学,2023,40(5):59-68
|
CSCD被引
5
次
|
|
|
|
8.
Zhou Z. Theoretical prediction model for deformations caused by construction of new tunnels undercrossing existing tunnels based on the equivalent layered method.
Computers and Geotechnics,2020,123:103565
|
CSCD被引
9
次
|
|
|
|
9.
张治国. 邻近开挖对既有软土隧道的影响.
岩土力学,2009,30(5):1373-1380
|
CSCD被引
45
次
|
|
|
|
10.
Zhang Z G. Geotechnical influence on existing subway tunnels induced by multiline tunneling in Shanghai soft soil.
Computers and Geotechnics,2014,56(3):121-132
|
CSCD被引
41
次
|
|
|
|
11.
梁荣柱. 考虑隧道剪切效应的隧道下穿对既有盾构隧道的纵向影响.
浙江大学学报(工学版),2018,52(3):420-430,472
|
CSCD被引
20
次
|
|
|
|
12.
甘晓露. 新建双线隧道下穿对既有盾构隧道影响研究.
岩石力学与工程学报,2020,39(S2):3586-3594
|
CSCD被引
15
次
|
|
|
|
13.
Gan X Y. Behaviours of existing shield tunnels due to tunnelling underneath considering asymmetric ground settlements.
Underground Space,2022,7(5):882-897
|
CSCD被引
1
次
|
|
|
|
14.
Liu B. Effects of undercrossing tunneling on existing shield tunnels.
International Journal of Geomechanics,2021,21(8):04021131
|
CSCD被引
1
次
|
|
|
|
15.
Feng G. Simplified method for evaluating tunnel response induced by a new tunnel excavation underneath.
International Journal for Numerical and Analytical Methods in Geomechanics,2024,48:1797
|
CSCD被引
1
次
|
|
|
|
16.
刘波. 基于隧道不均匀变形的地表沉降随机介质理论预测模型.
岩石力学与工程学报,2018,37(8):1943-1952
|
CSCD被引
20
次
|
|
|
|
17.
徐强. 隧道下穿施工引起既有隧道及地层变形预测的改进随机介质理论模型.
岩土工程学报,2023,45(2):301-309
|
CSCD被引
3
次
|
|
|
|
18.
Vlasov V Z.
Beams, plates and shells on elastic foundations. (in Russian),1966
|
CSCD被引
1
次
|
|
|
|
19.
毕晓东. 分数阶黏弹性Pasternak地基上两端固支Timoshenko梁的动力响应.
力学季刊,2023,44(1):122-132
|
CSCD被引
1
次
|
|
|
|
20.
徐凌.
软土盾构隧道纵向沉降研究,2005
|
CSCD被引
63
次
|
|
|
|
|