基于双时间窗的多设备串行系统机会维护策略
Opportunistic Maintenance Strategy for Multi-Unit Serial Systems Based on Dual Time Window
查看参考文献15篇
文摘
|
针对多设备串行系统,提出一种基于双时间窗策略的机会维护决策模型,改变传统单窗策略中以达到单设备最优维护周期为系统停机条件这一决策方式,转而以此作为维护决策触发条件,进而基于维护组合时间窗确定最佳的维护设备组合,并引入维护时机时间窗优化系统的维护停机时刻.在此基础上,通过最小化系统在规划期内的维护总成本,获取系统的最优维护策略.算例分析表明,双窗策略在维护总成本方面优于单窗策略. |
其他语种文摘
|
A decision model of opportunistic maintenance based on dual time window strategy is proposed for the multi-unit serial system. Instead of taking the arrival of a single unit's optimal maintenance interval as the system shutdown condition in traditional single window strategy,dual time window strategy takes it as the trigger condition in maintenance decision. It decides the best maintenance equipment combination based on the maintenance time window for unit grouping,and introduces a new maintenance time window for preventive maintenance implementation to optimize the system downtime. On the basis of dual time window,the optimal maintenance strategy of the system is obtained by minimizing total maintenance cost of the system during the planning period. The example analysis shows that the dual window strategy is better than the single window strategy on total maintenance cost. |
来源
|
上海交通大学学报
,2020,54(1):69-75 【核心库】
|
DOI
|
10.16183/j.cnki.jsjtu.2020.01.009
|
关键词
|
多设备串行系统
;
预防维护
;
机会维护
;
维护成本
;
维护时间窗
|
地址
|
上海交通大学机械与动力工程学院, 上海, 200240
|
语种
|
中文 |
文献类型
|
研究性论文 |
ISSN
|
1006-2467 |
学科
|
自动化技术、计算机技术 |
基金
|
国家自然科学基金
|
文献收藏号
|
CSCD:6686294
|
参考文献 共
15
共1页
|
1.
Lim J H. Optimal periodic preventive maintenance schedules with improvement factors depending on number of preventive maintenances.
Asia-Pacific Journal of Operational Research,2007,24(1):111-124
|
CSCD被引
7
次
|
|
|
|
2.
周晓军. 一种考虑修复非新的多设备串行系统机会维护动态决策模型.
上海交通大学学报,2007,41(5):769-773
|
CSCD被引
13
次
|
|
|
|
3.
苏春. 基于滚动窗口方法的风力机动态机会维修优化.
机械工程学报,2014,50(14):62-68
|
CSCD被引
14
次
|
|
|
|
4.
Zhou X J. A dynamic opportunistic preventive maintenance policy for multi-unit series systems with intermediate buffers.
International Journal of Industrial & Systems Engineering,2010,6(3):276-288
|
CSCD被引
3
次
|
|
|
|
5.
Laggoune R. Opportunistic policy for optimal preventive maintenance of a multi-component system in continuous operating units.
Computers & Chemical Engineering,2009,33(9):1499-1510
|
CSCD被引
19
次
|
|
|
|
6.
Khaira A. An optimized decision for opportunistic maintenance or event-driven maintenance of industrial system.
International Journal of Scientific & Engineering Research,2012,3(6):1403-1407
|
CSCD被引
1
次
|
|
|
|
7.
Vu H C. Maintenance planning and dynamic grouping for multi-component systems with positive and negative economic dependencies.
IMA Journal of Management Mathematics,2015,26(2):145-170
|
CSCD被引
2
次
|
|
|
|
8.
Xia T B. Optimization of multi-objective preventive maintenance for series-parallel deteriorating systems.
Computer Integrated Manufacturing Systems,2010,16(4):783-788
|
CSCD被引
1
次
|
|
|
|
9.
朱传军. 基于维修时间窗的柔性作业车间调度优化研究.
中国机械工程,2016,27(10):1337-1343
|
CSCD被引
9
次
|
|
|
|
10.
Ding F F. Opportunistic maintenance for wind farms considering multi-level imperfect maintenance thresholds.
Renewable Energy,2012,45:175-182
|
CSCD被引
19
次
|
|
|
|
11.
Zhao H S. A condition based opportunistic maintenance strategy for wind turbine.
Proceedings of the CSEE,2015,35(15):3851-3858
|
CSCD被引
1
次
|
|
|
|
12.
Lin Z X. A new maintenance strategy of combining preventive maintenance and opportunistic maintenance.
Safety and Reliability,2016,28(3):28-48
|
CSCD被引
2
次
|
|
|
|
13.
Canfield R V. Cost optimization of periodic preventive maintenance.
IEEE Transactions on Reliability,1986,35(1):78-81
|
CSCD被引
10
次
|
|
|
|
14.
Perez Ramirez P A. Decision support for life extension of technical systems through virtual age modelling.
Reliability Engineering & System Safety,2013,115:55-69
|
CSCD被引
1
次
|
|
|
|
15.
Su C. Optimizing upgrade level and preventive maintenance policy for second-hand pro-ducts sold with warranty.
Proceeding of the Institution of Mechanical Engineers, Part O: Journal of Risk & Reliability,2014,228(5):518-528
|
CSCD被引
4
次
|
|
|
|
|