中国VLBI网观测地球定向参数能力分析
Analysis of EOP Determination via Chinese VLBI Network
查看参考文献16篇
文摘
|
利用上海佘山站和乌鲁木齐南山站历年所参与的IVS联测数据进行了地球定向参数(Earth orienta-tion parameters,EOP)解算,结果表明,其精度与IERS EOP序列相当,两站单基线测定UT1的当前水平处于国际中等,但随着软硬件技术的发展,两站EOP观测精度在逐年提高。此外,2011年佘山站所参与的IVSUT1加强观测的UT1解算精度,以及两站参与国际EOP联测的解算精度都可以满足火星卫星百米量级定位精度对UT1的需求。 |
其他语种文摘
|
The EOPs are determined from the IVS observations which Sheshan Station in Shanghai and Nanshan Station in Urumqi were involved. The results show that the precision is comparable to the IERS EOP series, and the current precision of UT1 determined from single baseline observations of the two stations is in the middle level of the international. However, with the development of the technologies of software and hardware, the EOP precision for observations of the two stations is improving year by year. Besides, the determination precisions of UT1 either from the IVS intensive observations in 2011 with Sheshan jointed in or from international EOP observations with the two stations jointed in, can meet the requirements of the 100-m positioning precision of satellite of Mars to UT1. |
来源
|
武汉大学学报. 信息科学版
,2013,38(8):911-915 【核心库】
|
关键词
|
中国VLBI网
;
VLBI
;
地球定向参数
;
UT1
;
空间大地测量
|
地址
|
1.
中国科学院新疆天文台, 乌鲁木齐, 830011
2.
中国科学院上海天文台, 上海, 200030
3.
中国科学院新疆天文台, 中国科学院射电天文重点实验室, 乌鲁木齐, 830011
|
语种
|
中文 |
文献类型
|
研究性论文 |
ISSN
|
1671-8860 |
学科
|
测绘学 |
基金
|
国家自然科学基金资助项目
|
文献收藏号
|
CSCD:4915928
|
参考文献 共
16
共1页
|
1.
Herring T.
Treatise on Geophysics,2009
|
CSCD被引
1
次
|
|
|
|
2.
李金岭. 地球自转十年尺度波动与核幔耦合的可能机制.
地球科学进展,1997,12:514-518
|
CSCD被引
4
次
|
|
|
|
3.
Li Jingling. The Contribution of CVN to the CE-1 Mission.
Measuring the Future,2008
|
CSCD被引
1
次
|
|
|
|
4.
Schluter W. The International VLBI Service for Geodesy and Astrometry (IVS): Current Capabilities and Future Prospects.
Journal of Geodesy,2007,81(6/8):379-387
|
CSCD被引
8
次
|
|
|
|
5.
Boehm J. Plans for the Vienna VLBI Software VieVS.
The 19th European VLBI for Geodesy and Astrometry Working Meeting,Bordeaux,2009
|
CSCD被引
1
次
|
|
|
|
6.
韦文仁. 佘山站MK3磁带记录加密改进.
中国科学院上海天文台年刊,1996,17:253-258
|
CSCD被引
1
次
|
|
|
|
7.
Yasuhiro K. Rapid Turn Around EOP Measurements by VLBI over the Internet.
Earth and Environmental Science,2005,128:119-124
|
CSCD被引
1
次
|
|
|
|
8.
Boehm J. Universal Time from VLBI Single Baseline Observations During CONT08.
The 6th IVS General Meeting,2010
|
CSCD被引
1
次
|
|
|
|
9.
Hobiger T. The Effect of Neglecting VLBI Reference Station Clock Offsets on UT1 Estimates.
Advances in Space Research,2009,43:910-916
|
CSCD被引
3
次
|
|
|
|
10.
王广利. 利用IVS加强观测确定UT1的分析研究.
天文学报,2012,53(3):222-228
|
CSCD被引
7
次
|
|
|
|
11.
Mamoru S. Ultra-rapid UT1 Measurement by e-VLBI.
Earth Planets Space,2008,60:865-870
|
CSCD被引
2
次
|
|
|
|
12.
Finklstein A. Russian VLBI Network "Quasar":from 2006 to 2011.
The 5th IVS General Meeting,2008
|
CSCD被引
1
次
|
|
|
|
13.
钱志瀚.
甚长基线射电干涉测量,1983
|
CSCD被引
8
次
|
|
|
|
14.
Malkin Z. On Comparison of the Earth Orientation Parameters Obtained from Different VLBI Networks and Observing Programs.
Journal of Geodesy,2009,83(6):547-556
|
CSCD被引
2
次
|
|
|
|
15.
李金岭. 关于我国天测与测地VLBI网络未来建设的讨论.
武汉大学学报·信息科学,2010,35(6):670-671
|
CSCD被引
15
次
|
|
|
|
16.
魏二虎. 近三年VLBI观测的数据处理及分析.
武汉大学学报·信息科学,2008,33(12):1275-1278
|
CSCD被引
8
次
|
|
|
|
|